Setup Guide
Before your team uses site diaries and defects, set up three core data lists. All three follow the same process: export → fill → import.
Equipment List
Portfolio settings → Records Site diaries Equipment
Defect Conditions
Portfolio settings → Records Defects Typical conditions
Site Locations
Portfolio settings → Project settings Locations
The Level System
All three lists use the same hierarchical structure:
Level 1 = Parent category
Plastering, Site Equipment, Building A
Level 2 = Subcategory
Stopping incomplete, Scaffolding, Apartment 101
Level 3 = Further detail (optional)
Living Room, Main Bathroom
How to Set Each Up
⚙️ Equipment List
🔍 Defect Conditions
Example: Level 1: Plastering | Level 2: Stopping incomplete
📍 Site Locations
Example: Building A | Apt 101 | Living Room
⏱️ Time Estimate
Setup can take 1–2 hours for multi-unit projects. Only 1 item per row will work. We suggest using an AI tool to help if possible.